How long does lead abatement take?

Home » Damage Restoration FAQs » How long does lead abatement take?

The duration of lead abatement depends on the size of the area, the level of contamination, and the method used. Smaller projects may take a day or two, while larger or more complex jobs can take several days to a week or more. The process also includes time for preparation, containment, and post-abatement clearance testing to ensure the area is safe. A qualified contractor can give you a more accurate timeline based on your specific needs.

WE CLEAN COVID-19

Below is a brief overview
of our comprehensive plan, which can be implemented by a simple call to:
234CLEAN19 (234-253-2619)

  • COVID-19 CONTROL AND PREVENTION
  •  GENERAL GUIDANCE FOR WORKERS AND EMPLOYEES
  • ENHANCED CLEANING METHODS FOR PREVENTION
  • HOW TO IDENTIFY THE SIGNS OF POTENTIAL CASES AND ISOLATION
  •  SUGGESTED PERSONAL PROTECTIVE EQUIPMENT
  • CLEANING AND APPLYING DISINFECTANTS IN COMMUNITY AREAS AND
    FACILITIES
  • CLEANING PROCEDURES & APPLYING OF DISINFECTANTS AFTER
    CONFIRMED CASES
  • WE USE ELECTROSTATIC EQUIPMENT TO APPLY DISINFECTANTS FOR
    IMPROVED RESULTS